Quote Originally Posted by Verismo View Post
Awesome, Brokenhand. How long does it take to deploy? How do you keep it cool?

Jason
It takes about 15 seconds to pop it open and step inside out of the rain. Once inside, there are two aluminum support bars that have to be extended then locked in place by screwing down a knob...that takes another 15 seconds. Then one final walk around outside the trailer to make sure the canvas is pulled down over the edges. You still have to level the trailer, 2 leveling jacks on the back, one under the hitch. In total, about 4 mins to properly setup and level. To quickly get out of the rain, 30-60 seconds.

I’ve been contemplating buying a Rigid portable fan that uses lithium 24v battery packs. I haven’t settled on that idea yet. Otherwise, the trailer has 4 windows that can be unzipped, allowing a breeze to blow through the mesh bug screen.